Create Cable from existing geometry

This workflow is required to define the successive connected layer points when implementing ring strategies. It is sufficient to record the connection of the layer points as a straight line. The planning then takes into account the available possible trenches. See also Manual rings.

Open workflow

Switch to the workflow explorer using the mceclip1.png button.

mceclip2.png

This is where you start the desired “Create Cable from existing geometry” workflow

  1. by right-clicking > “Execute”, or
  2. double-clicking

on the corresponding entry.