Direct transition from a street crossing to a drop trench
In the example, the northern possible trench has been blocked
…and unfortunately, this means that the optimization cannot connect the northern buildings.
Solution
This problem can be solved
- by shifting the street center line to the southern possible trench and setting the width to 0, or
- only partially locking the topside possible trench on the access route.