After the conversion, it is important to check that everything has been converted as expected.
For this purpose, various reports and overviews can be accessed in NET Engineering.
Check the naming by creating labels or checking in the form.
- Trench > Duct Names in the first layer
- Buildings
- FO Terminator Name in the building
- Duct Insertion Name
- Duct End Overview
Check the Fiber connections in the Building, Distribution Point and POP.
- Splice report or splice plan schema
- Splice overview for checking the entire fiber path
- Fiber End Overview
Check the Duct connections.
- Show Labels or report for the Duct Point
- Duct endings overview