Opening the form
Open the form by right-clicking in the Industry Model Explorer under Data Model > Planning Result > Demand Point
or
double-clicking on the demand point geometry in the graphic window > clicking on the “Resulting Demand Point” field in the Demand Point form.
Note
The result connection point can be visualized in the project via the view TC_PL_V_OUT_DEMAND_POINT.
Evaluation of the connection
A value between 0 and 1 visualizes the evaluation of the connection. The value 0 is assigned to the connection point with the lowest development costs, the connection point with the highest costs is assigned the value 1.