Result: Resulting Demand Point

Opening the form

Open the form by right-clicking in the Industry Model Explorer under Data Model > Planning Result > Demand Point

or

double-clicking on the demand point geometry in the graphic window > clicking on the “Resulting Demand Point” field in the Demand Point form.

Note

The result connection point can be visualized in the project via the view TC_PL_V_OUT_DEMAND_POINT.

mceclip0.png

Evaluation of the connection score

A value between 0 and 1 visualizes the evaluation of the connection score. The value 0 is assigned to the connection point with the lowest development costs, the connection point with the highest costs is assigned the value 1.

In detail, this value is made up of the proportional use of routes, pipes and cables of each demand unit within a connection point. The fiber runs required to connect the connection point to the highest network node (usually CO or backbone handover point) are considered here.

The costs for the individual objects such as routes, pipes, etc. are divided proportionally among all connection points that use the respective object.

The results of the calculation are normalized to a decimal value between 0 and 1.

The "Connection score" should only be used to identify conspicuously unfavorably connected connection points.

Stylisation recommendation

If you want to visualise the "Evaluation of the connection" of the Result: Connection point in colour, you can achieve this in the stylisation via "New theme" in the style editor. You can find out how to do this here.