Opening the form
Open the form by right-clicking in the Industry Model Explorer under Data Model > Planning Result > Resulting Cable
or
by double-clicking on the result cable geometry in the graphic window.
Attributes
Phase
At the Result: Resulting Cable, we find the Phase attribute of the rollout phase area where the cable is located.
Deployment
YES > the element will be built immediately.
NO > the element will be built at a later time.
The Deployment attribute is filled depending on the Connection Type attribute at the connection point.
References
The result cables have a link with the input cable attribute if it is a result from an input / existing cable.
The “Cable Topology” indicates whether it is a default (direct), ring or ring-branch topology.
The name “Cable Type” is taken from the cable identifier of the optimizer settings in the corresponding layers.