Opening the form
Open the form by right-clicking in the Industry Model Explorer under Data Model > Planning Result > Resulting Structure
or
by double-clicking on the result structure geometry in the graphic window.
Phase
At the Result: Resulting Structure, we find the Phase attribute of the rollout phase area in which the structure is located.
Deployment
YES -> the element will be built immediately.
NO -> the element will be built at a later time.
The Deployment attribute is filled depending on the Connection Type attribute at the demand point.
References
The Result: Resulting Structure has a link to the attribute Structure (Input), if it is results from input/drawn existing structure.
The "Structure class" for the result structures can be defined in the optimizer settings as Manhole, Handhole or Cabinet.