Settings for the Export— Phases

When exporting to NET Engineering, the elements to be exported can be assigned the corresponding status in NET Engineering depending on the phases (from the rollout phase area) and the deployment (controlled by the connection type at the building).

Prerequisite for this is the status is defined in the NET Engineering template file.

mceclip0.png